FULL KITCHEN RE-FIT, ILMINSTER, 2012
This was a challenging, but fulfilling job.
The wall cupboards had to be fitted very close to the ceiling coving, and the worktop to the level of the glass serving hatch, which was above the height of the base units.
This lovely kitchen, with its’ beautiful slate effect worktop took just 7 days to fit, and that included the ripping out of the old kitchen, tiling all the walls and floor and re-piping the extractor as kitchen smells were blowing back inside in the original kitchen.
This family were delighted with their new kitchen!